{"id":3233,"date":"2019-12-10T15:10:44","date_gmt":"2019-12-10T15:10:44","guid":{"rendered":"http:\/\/www.www.reinforcedearth.ph\/?post_type=avada_portfolio&p=3233"},"modified":"2022-01-12T11:05:01","modified_gmt":"2022-01-12T11:05:01","slug":"techwall-uchumayo","status":"publish","type":"avada_portfolio","link":"https:\/\/www.reinforcedearth.ph\/reinforced-earth\/techwall-uchumayo\/","title":{"rendered":"TechWall™ Retaining Walls for Uchumayo Motorway"},"content":{"rendered":"
Tierra Armada Peru Provides Cost- and Time-Saving TechWallTM<\/sup> Retaining Wall Solution for Busy Motorway into Arequipa<\/span><\/p><\/h1><\/div> Consisting of a two-lane low-level route for heavy vehicles plus two surface-level connector roads for urban traffic, the Uchumayo Motorway project<\/a>\u00a0was initially designed to be built with conventional reinforced concrete walls. By proposing an alternative solution based on the use of TechWall\u00ae<\/a>\u00a0prefabricated walls with counterforts, Tierra Armada Peru<\/a>\u00a0generated both time and budget savings, since the cost of the reinforced concrete walls had considerable impact on the overall project.<\/p>\n The project was divided into three phases. The entire three-phase project involves the installation of more than 45,000 m2 of walls. To date, sections I and III have been completed for a total of nearly 20,000 m2\u00a0of TechWall\u00ae walls, with the remaining section II scheduled for completion during 2018.<\/p>\n For this task Tierra Armada made use of a prefabrication plant located in Arequipa less than 5 kilometres from the project site. The plant was fitted out with the work trains required to maintain output in accordance with the project requirements.<\/p>\n Arequipa is Peru\u2019s second-largest city with a population of approximately 1.3 million. The new Variante de Uchumayo Motorway, main access road into Arequipa, is being constructed by the Arequipa Regional Government to address the long-standing traffic jams that drivers face when entering the city.<\/p>\n<\/div> TechWall brochure<\/span><\/a><\/p>\n<\/div><\/div><\/div>RELATED SOLUTIONS<\/h4><\/a><\/li>
RELATED MARKETS<\/h4><\/a><\/li>
RELATED COUNTRIES<\/h4><\/a><\/li><\/ul><\/div>
RELATED SOLUTIONS<\/h4><\/a><\/li><\/ul><\/div>
\r\n\t\t\t\t\t\t\tFirst Low Carbon Footprint MSE Wall in the Philippines<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tDesign, material supply, on-site casting, and construction of Reinforced Earth\u00ae wall structures for Philippines\u2019 Cebu Airport<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tTindharia Project - the world\u2019s tallest Reinforced Earth\u00ae structure<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div><\/div>
RELATED MARKETS<\/h4><\/a><\/li><\/ul><\/div>
\r\n\t\t\t\t\t\t\tFirst Low Carbon Footprint MSE Wall in the Philippines<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tRoads and motorways<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tTechWall™ Retaining Walls for Pedestrian Crossing<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tDesign, material supply, on-site casting, and construction of Reinforced Earth\u00ae wall structures for Philippines\u2019 Cebu Airport<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tTechWall™ Retaining Walls for Uchumayo Motorway<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Walls for Highway 407 East Phase 2<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\tTindharia Project - the world\u2019s tallest Reinforced Earth\u00ae structure<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div><\/div>